This unique attachment will mix and pour up to 200 pounds (90.7 kg) of dry cement. The specially designed auger flighting inside the cement bowl keeps the cement in the bowl during mixing. This same auger design permits cement to be poured into fence post holes with the posts in place.
Cal-Line’s new facility, in National City, is a full-service location providing diagnostic evaluation, routine maintenance, welding, hydraulic troubleshooting, parts and climbing gear accessories.